PROJECT : Cisco Systems Corporate Campus
LOCATION: San Jose, CA
CONSTRUCTION VALUE: $300 Million estimated
OWNER: Cisco Systems
PROJECT MANAGER: CBRE
GENERAL CONTRACTOR: Devcon Construction
ARCHITECT: Devcon Construction; Gensler
The Cisco System Corporate Campus consisted of Signet providing services for multiple projects from 1996 to 2008 on Sites 2, 3, and 4. Site 2 ($63 million) consisted of three structural steel multi-level steel buildings and one concrete frame tilt-up structure situated on a 25-acre site totaling 550,000 square feet. Site 3 ($33 million) consisted of three 2-story concrete tilt up buildings situated on a 13-acre site totaling 314,000 square feet. Site 4 consisted of ten 3-story, eight 4-story, and one 5-story buildings situated on a 125-acre site totaling more than 1,350,000 square feet.
Signet provided special inspection and testing for including soils/AGG/AC lab testing, field compaction, AC observation and materials sampling, pile/pier observations, concrete, masonry, shotcrete, rebar/strand ID sampling, shop and field welding inspection, NDT, and high-strength bolting.